PROJECT OVERVIEW

Caledonia Station is where the Crosstown LRT and the GO Barrie line will intersect. The Crosstown is a 19-kilometre light rail transit line (LRT) that will run through the heart of Toronto. Running along Eglinton Avenue, the LRT will connect west to east from Jane Street/Black Creek Drive to Kennedy Station. Ten kilometres will be tunnelled underground between Keele Street and Laird Drive and will continue east on an at-grade right-of-way separated from traffic to Kennedy Station, where it will join with a converted Scarborough RT line on an elevated structure. The Crosstown will cut travel time significantly and conveniently link to 54 local bus routes, three TTC interchange subway station and GO Transit. Travel along The Crosstown from Kennedy to Black Creek Drive will be significantly faster and more comfortable than current bus travel. It is modern, fast, reliable, comfortable, and environmentally friendly.

SCOPE OF WORK

As Electrical Contractor, MultiTech was responsible for installing all electrical equipment downstream from the medium voltage switchgear including transformers, and low voltage distribution. In addition, we were responsible for all systems conduits/cabling required for the new high tech rail system. These systems included but not limited to GIDS, SCADA, Metering, FA, PA, CCTV, ACCESS Control, EAS, PVIS, ADS, DAS/Cell, WIFI, SIGNAGE, etc.